Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Monjia Belizaire. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 
 
 

 

Welcome to Monjia Belizaire's AE Senior Thesis e-Portfolio!

 

Thesis Abstract

The abstract for City Hospital outlines the key project features of all the building systems as well as a background on the building program itself.

City Hospital Phase I is being constructed as part of a three phase construction of the City hospital. Phase I which is the crux of my thesis includes four levels below grade, phase II is a 8-floor steel frame building above grade. Both phase I and II will be used for research in medicine. Phase III will be an extension of phase I and II, it is a planned expansion to add 14 more floors, to make a total of 22 total floor above grade.

Click on image below for a full view of my thesis abstract in pdf format.

 

abstract





PACE Poster

Click on image below for a full view of my PACE Seminar poster in pdf format.

 

   