Note: While great efforts have been taken to provide accurate and complete info-rmation on the pages of CPEP, please be aware that the information contained here with is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Steve Horna. Changes and discrepancies in no way imply that the original design contained errors or wasflawed. Differing assump- tions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
Welcome to Horna's AE Senior Thesis e-Portfolio
update log
Date
Event
8.30.07
Received Owners Permission
8.27.07
5th Year Course Work Begins
8.31.07
Posted Building Statistics part I
9.21.07
Posted Bio Sketch On CPEP
10.5.07
Posted Technical Report I On CPEP
11.15.07
Posted Technical Report II On CPEP
12.3.07
Posted Technical Report III On CPEP
12.17.07
Posted Building Statistics part II
12.18.07
Posted Final Thesis Proposal and Executive Summary