Note: While great efforts have been taken to provide accurate and complete info-rmation on the pages of CPEP, please be aware that the information contained here with is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Steve Horna. Changes and discrepancies in no way imply that the original design contained errors or wasflawed. Differing assump- tions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
|
|
|
Technical assisnment 1 introduces detailed infromation on Shaare Tefila
Congregation,
including: project schedule summary, building systems summary,
project cost evaluation,
site plan of existing conditions, local conditions, client
information, project delivery
system, and staffing plan. The purpose of this report
is to become more familiar with the
thesis building.
|
technical assignment 2: Cost and Methods Analysis
Technical assignment 2 develops on the items in tech assignment 1, but to fuller
detail.
This report includes: a detailed project schedule, site layout plan, assemblies
estimate,
detailed structural systems estimate, and general conditions estimate.
|
technical assignment 3: Alternative Methods and Research
Technical assignment 3 introduces research topics to be investigated for the final
presentation in the spring. This report includes: critical industry issues, critical
issues
research method, problem identification, technical analysis methods and a