UNDER CONSTUCTION
|
be aware that the
information contained herewith is considered a work‐inprogress for this
thesis project. Modifications
and changes related to the original building designs and construction
methodologies for this senior thesis project are
solely the interpretation of Christopher Ankeny. Changes and
discrepancies in no way imply that the original design
contained errors or was flawed. Differing assumptions, code
references,requirements, and methodologies have been
incorporated into this thesis project; therefore, investigation results
may vary from the original
design.
This page was last
updated: 9/3/10 by Johnathan Peno and is hosted by the PSU AE
department c 2010