WELCOME TO GONZALO LAY'S AE SENIOR THESIS E-PORTFOLIO

 
The Intramural Building Addition and Renovation project is a sport complex facility located in University Park, PA. The construction of Phase I consists of a 48,000 SF expansion, which connects to the existing building, managed by Mortenson Construction. This addition will offer the Pennsylvania State University students new opportunities to have a more active lifestyle in the school environment. The new addition will feature a newly and updated fitness and cardio loft, multipurpose rooms, and an elegant, inviting entrance. Upon completion, the project will achieve a LEED certified rating.
 
 
Senior Capstone Project
Construction Progress Photos
Recent Updates & News
 
 
The Capstone Project Electronic Portfolio (CPEP) is a web-based project and information center. It contains material produced for a year-long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements click here.
Interior finishes Gym March 20th, 2014
Interior Progress September 5th, 2013
Exterior Facade Progress September 5th, 2013
Concrete Slab on Grade Pour Prep August 15th, 2013
SE Enclosure Progress August 14th, 2013
Wall Mockups July 8th, 2013
Metal Decking Installation July 8th, 2013
SE Progress June 24th, 2013
Steel Erection - June 4th, 2013
Retaining Wall and Elevator Shaft - May 5th, 2013
4/26/2014 CPEP Complete & Ready for Review
4/26/2014 PACE Poster Posted
4/26/2014 Final Presentation (PDF) Posted
4/26/2014 Final Presentation (PP) Posted
4/21/2014 Reflection Posted
4/9/2014 Final Report Posted
4/9/2014 Thesis Research Updated
2/3/2014 Revised Proposal Posted
2/3/2014 Revised Breadths Posted
1/24/2014 Revised Breadths Posted
1/17/2014 Revised Proposal Posted
12/15/2013 Proposal Posted
12/12/2013 Technical Report III - II Posted
12/12/2013 Technical Report III - I Posted
10/24/2013 Technical Report II Posted
10/18/2013 Abstract Posted
10/18/2013 Building Statistics II Posted
10/12/2013 Technical Report I Posted
9/16/2013 Building Statistics I Posted
9/16/2013 Student Bio Posted
9/6/2013 Construction Progress Photos Up
9/2/2013 CPEP Published
7/23/2013 Obtained Project Documents
6/5/2013

Obtained Owner Permission

 

 
ALL IMAGES/RENDERINGS OF THE INTRAMURAL BUILDING ADDITION AND RENOVATION WERE SUPPLIED BY MORTENSON CONSTRUCTION AND MOODY NOLAN WITH OWNER PERMISSION. ALL CONSTRUCTION PHOTOGRAPHS AND PROJECT INFORMATION WERE SUPPLIED BY MORTENSON CONSTRUCTION AND MOODY NOLAN, UNLESS OTHERWISE NOTED.
 
 

 

User Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Gonzalo Lay. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
 
This page was last updated on April 28, 2014 , by Gonzalo Lay and is hosted by the AE Department ©2014