WELCOME TO GONZALO LAY'S AE SENIOR THESIS E-PORTFOLIO
 
Technical Reports
 
   
To view Technical Reports I, II or III, please click the images below to access the web page
Technical Report I  
Post Date: October 15, 2013  
Technical Report 1 provides a detailed overview of the construction of the Intramural Building Addition and Renovation. In this report, an analysis of the client information, project schedule, building systems, project costs, existing conditions, delivery system, and staffing plan can be found. To view the report, please click the image below.
Technical Report II  
Post Date: October 24, 2013
Technical Report 2 provides an analysis of the Intramural Building Addition and Renovation's key features that affect the project execution. In this report, a detailed project schedule, structural and MEP system estimate, site layout plans, General Conditions estimate, Contractibility challenges and LEED evaluation can be found. To view the report, please click the image below.
Technical Report III
Post Date: December 12, 2013
Tecnical Report 3 focuses on identifying areas of the Intramural Building Addition and Renovation that could potentially be research topics. Find in this report analyses looking at schedule acceleration, value engineering, critical industry issues, feedback from the PACE roundtable, and problem identification and technical analysis options.

Part I

Part II

   
ALL IMAGES/RENDERINGS OF THE INTRAMURAL BUILDING ADDITION AND RENOVATION WERE SUPPLIED BY MORTENSON CONSTRUCTION AND MOODY NOLAN WITH OWNER PERMISSION. ALL CONSTRUCTION PHOTOGRAPHS AND PROJECT INFORMATION WERE SUPPLIED BY MORTENSON CONSTRUCTION AND MOODY NOLAN, UNLESS OTHERWISE NOTED.
 
 

 

User Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Gonzalo Lay. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
 