Technical Assignments

 

TECHNICAL ASSIGNMENT 1 : Full Report / Executive Summary

        This assignment is an overview of my existing building, Sallie Mae HQ. This project consists of a 9 story office building which has spans reaching over 50 ft. The building is a steel tower structure with concentric and eccentric braced frames that are concealed in the stairwells and the elevator walls. These main elements provide the lateral resistance of the building.

 

TECHNICAL ASSIGNMENT 2 : Full Report / Executive Summary

        This assignment focuses on four alternative floor systems; which are primarily controlled by the long spans in Sallie Mae HQ. My four alternatives are post-tensioning, precast-prestressed double tee beams, long span joist, and an alternative layout to the original steel design. To decide which one is the best to consider for my proposal, I will have to consider cost, weight, constructability, potential conflicts, and vibration.

 

TECHNICAL ASSIGNMENT 3 : Full Report / Executive Summary

        This assignment consists of a detailJanuary 22, 2006was performed on my building by distributiing the forces by rigidity. These calculations were implemented in spreadsheets. AlJanuary 22, 2006ctions in the building.

 

 

 

 

 

 

 

 

 

The Capstone Project Electronic Portfolio (CPEP) is a web-based project and information center. It contains material produced for a year-long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering.