Adam Weis

Construction Management
Wilkes-Barre/Scranton International Airport
Avoca, PA

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Adam Weis's AE Senior Thesis e-Portfolio

Technical Assignments

Proposal

Executive Summary & Proposal

The proposal that has been selected is going to deal with the affect and application of 4D animation and modeling during the preconstruction process. A summary of how the topic will be researched and analyzed along with three other breath topics will be drawn out.

Technical Assignment 1

 Executive Summary & Tech 1

Tech assignment 1 is the part of the thesis that is supposed to familiarize oneself with the project. The assignment contains a project schedule, estimate site plan; and summaries of the owner, building systems and project organization. Many ideas for these topics will also present themselves. This document is subject to change.

Technical Assignment 2

Executive Summary & Tech

Tech assignment 2 is a more in depth assignment looking at scheduling and estimating. There are three estimates found within as well as a detailed schedule. There is also a site layout of the finishing phase of the project.

Technical Assignment 3

Executive Summary & Tech

Tech assignment 3 is a look as to what research will be done for the spring semester. A thesis topic is selected as well as three or four issues with the building will be analyzed.

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact Adam Weis |
This Page was last updated on April 25, 2006 , By Adam Weis and is hosted by the AE Department ©2005