Progress Log

Date Announcement
3.31.06 Thesis Final Report Posted
12.15.05 Proposal Updated/Time Table Added to Progress Log
12.10.05 Thesis Proposal Posted
11.21.05 Technical Report #3 Posted
10.31.05 Technical Report #2 Posted
10.05.05 Technical Report #1 Posted
10.05.05 Abstract Posted
9.19.05 Building Statistics Posted
8.30.05 Started 5th year course work

 

Time Table

Week # Section to Complete
1 (January 9) Trusses (Research)
2 (January 16) Loads and Design Floor Systems
3 (January 23) Design Trusses
4 (January 30) Design Columns
5 (February 6) Design Columns
6 (February 13) Lateral Loads
7 (February 20) 3-D Model
8 (February 27) Analysis of Structure/ Make Changes
9 (March 6) Spring Break
10 (March 13) Coordination of Trades
11 (March 20) Heat Rejection
12 (March 27) Clean-up Design/ Begin Final Presentation
13 (March 3-5)) Prepare Final Presentation

 

Task Schedule

A more in depth list of tasks to be completed can be found here.

 

 

 