Welcome to Mark W. Miller'sAE Senior Thesis e-Portfolio
FINAL REPORT – This document contains the final report in its entirety of the “Lighting for Senior Living & A Feasibility Study for Geothermal Heat Pumps” Project done on Sibley Memorial Hospital’s – Grand Oaks Assisted Living Facility. This report contains the Lighting Depth Study, Mechanical Feasibility Study, Electrical Depth, and Construction Management Breadth that were done to complete the spring semester senior thesis project.
Background, Architecture, Site
Mechanical Breadth – A Feasibility Study on Geothermal Heat Pumps
Construction Management Breadth
Appendix A
Appendix B
Appendix C
The following report is a culmination of the past year's research and analysis of Mark W. Miller's Thesis Building.