Steven Puchek

Lighting/Electrical
Cathedral Place
Milwaukee, WI

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio

Cathedral Place - Building Statistics

This text section is currently under construction due to the formatting and length. For the time being, you may download the entire Building Statistics v1.0 from here in PDF form. The links in the PDF will not work, the ones below should.

Thank you for your patience.

 

Cathedral Place


• Location and Site: 555 E Wells St., Milwaukee, WI 53202
“Juneau Town” Neighborhood
South of Cathedral Square Park
Occupies east half of the 500 E Wells block
Street frontage to Wells, Jackson St, Mason St.

• Occupancy or Function Types:
Mixed Use – Commercial/Office, Commercial/Retail, Multi-Dwelling Residential, Parking (Structure)

• Size: 649,000 sqft total
Parking – 373,000 sqft
Office – 273,000 sqft
Condo – 55,000 sqft
Retail – 18,000 sqft

• Number of stories above grade – 17 floors (19 w/ Mezzanines)

• Total Levels – 18 floors (20 w/ Mezzanines)

• Property Manager: Pentagon Management

• Tenants:
Office:
Deloitte & Touche (floors 11-14)
Whyte Hirschboeck Dudek S.C.(floors 15-18)
Retail:
AAA Insurance
Glow – Salon & Spa
Yanni’s – Steaks, Chops, Seafood
The Panini Co. – Deli, Bakery, Café
Eden – Alternative Florist
Residential:
27 Single-Family Condos (floors 1Mezz-10Mezz)

• Building Developer: Van Buren Management, Inc.

• Owner: Cathedral Place, LLP
(sub of Van Buren Management, Inc.)

• Owner Representative / CM: Mike Comerford - Comerford Development Resources

• Residential Developer: New Land Enterprises, LLP

• Architect (Core and Shell): Solomon, Cordwell, Buenz & Associates, Inc.

• Architect (Interior Offices): Gensler Architects

• General Contractor: KBS Construction, Inc.

• MEP Engineering: Arnold & O’Sheridan, Inc.

• Structural Engineering: Magnusson Klemencic Associates
(formerly Skilling Ward Magnusson Barkshire

• Surveyor: National Survey & Engineering

• Contractors:
Lurie Glass (curtain-wall)
Otis (elevators)
Grunau (plumbing)
US Fire Protection (fire protection)
Wenninger (HVAC) – redirected link
Staff Electric Company , Inc. (electrical)

• Dates of Construction:
Notice to Proceed - January 2002
Demolition, Excavation, and Construction - March 2002
Occupancy and Substantial Completion - November 2004
Anchor Tenant Move-in And Punchlisting - March 2004

• Cost:
Hard Costs:
General Construction - $25,000,000
Curtain-wall Construction - $5,600,000
Electrical Construction - $1,700,000
HVAC Construction - $1,500,000
Plumbing Construction - $700,000
Elevators Construction - $1,750,000
Fire Protection Construction - $490,000
Demolition - $180,000
Hazard Abatement - $140,000
Parking Controls - $180,000
Permits - $100,000
Soft Costs:
All A/E/CM Fees,
Land Costs,
Variance Fees,
Bank/Loan Costs, etc.       $15,000,000 (estimate)

Overall Cost (with Soft Cost estimate): $53,040,000

• Project Delivery Method: Guaranteed Maximum Price – Cost plus Fee
(AIE A1.11)

• National Model Codes:
Architecture: BOCA 2000
Mechanical: 2002 Wisconsin International Enrolled Code
(variance granted during State transition)
Electrical: NEC 2002
Plumbing: 2001 Wisconsin Dept of Commerce Plumbing Code (w/ city amendments)

• Historical Requirements:
No Local Historic Significance
No National Historic Significance
(Verified by Milwaukee GIS data)

Senior Thesis Home | The Pennsylvania State University | Architectural Engineering | AE Computer Lab | |
This page was last updated on November 28, 2005 , By Steven Puchek and is hosted by the AE Department ©2005