Steven Puchek

Lighting/Electrical
Cathedral Place
Milwaukee, WI

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio

Technical Assignments

Proposal

Lighting Proposal

Technical Assignment 1 - Existing Lighting Conditions and Design Criteria

Executive Summary - (27 KB)

Tech 1 - (4.7 MB)

Technical Assignment 2 - Existing Electrical System and Load Analysis

Executive Summary - (20 KB)

Tech 2 - (294 KB)

Tech 2 with Supplemental - (w/ Riser, Single Line, and Motor Schedule) - (1.2 MB)

Technical Assignment 3 - Lighting Schematic Design Phase and Presentation to Lutron

Executive Summary - (33 KB)

Tech 3 - as presented at Lutron - (20.7 MB)

Comments from Lutron - (52 KB)

 

 

Senior Thesis Home | The Pennsylvania State University | Architectural Engineering | AE Computer Lab | |
This page was last updated on December 11, 2005 , By Steven Puchek and is hosted by the AE Department ©2005