This report details the planned research and analysis topics for the upcoming spring semester. The first item discussed is the critical industry issue of subcontractor bid markups. The research will assess the characteristics of CM and GC companies that cause these markups to vary so widely within the industry. Next, the report details three technical analyses to be performed on the Cancer Institute, with a focus on value engineering, constructability, and schedule reduction. At the conclusion of the research, the findings will be documented and presented before a jury for evaluation.
Executive Summary
Final Draft Proposal (PDF 281 kB)
User Note:
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP,
please be aware that the information contained herewith is considered a work-in-progress for this thesis project.
Modifications and changes related to the original building designs and construction methodologies for this
senior thesis project are solely the interpretation of Chris Voros. Changes and discrepancies in no way
imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements,
and methodologies have been incorporated into this thesis project; therefore, investigation results may
vary from the original design.