Date Announcement
Current Status Newest announcement are added to the top
4.24.06 Senior Thesis Complete   
4.23.06 ABET, Course & CPEP Reflections Posted
4.10.06 Sears Centre Thesis Presentation   
4.3.06 Final Report Posted
4.2.06 Final Report Formatted
1.26.06 Thesis Schedule Posted
1.21.06 "DBOM" Questionnaire
1.12.06 Updated Thesis Breadth
1.10.06 Contact CIMCO Refrigeration
12.12.05 Thesis Proposal Posted
12.5.05 Request Research Topics
11.21.05 Technical Assignment #3 Posted
11.9.05 Problem Identification Posted
11.6.05 Technical Assignment #2 Posted
10.19.05 Critical Industry Issues Posted
10.12.05 PACE Roundtable
10.6.05 Building Abstract Posted
10.5.05 Technical Assignment #1 Posted
9.28.05 Review Contract Exhibits
9.27.05 Obtain Civil Drawings and Site Layout
9.20.05 Resume Posted
9.15.05 Technical Assignment Distributed

Information flow entered Bottom-Up (Past Reference to Most Recent)

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact Arnon Bazemore |
This Page was last updated on April 23, 2006 , By Arnon Bazemore and is hosted by the AE Department ©2005