Welcome to Jayme's AE Senior Thesis e-Portfolio
Final Report
My final thesis report analyzes a few different mechanical systems. The base system is the existing mechanical system of a variable air volume (VAV) system with self contained packaged DX units and condenser water. The following four systems are compared to the base case: A VAV system with a central chilled and hot water plant, as a base case in comparison to a VAV system with a central chilled and hot water plant, a dedicated outdoor air system (DOAS) with VAV as a parallel system using DX units, a dedicated outdoor air system (DOAS) with VAV as a parallel system using a central chilled and hot water plant, and a dedicated outdoor air system (DOAS) with radiant cooling and heating as the parallel system (using a central chilled and hot water plant).
My breadth work included a structural study on roof equipment loads and a constructability study since the Administration building is an existing building.
List of Tables, Figures, and Charts
Depth Work - Alternative Mechanical Designs
Breadth Work - Integration of Structural System and Constructability