Welcome to Tim Mueller's AE Senior Thesis e-Portfolio
Thesis Proposal
The redesign of the CDRH Laboratory will include changing the the stuctural system from cast-in-place concrete to a steel system. The new stuctural system will be designed with special conciderations of virbation on the floor system and the lateral bracing. There will also be breadth studies completed on the cost and duration of the building to find which system is the most economic, as well as on the architecture of the building to see how appropriate a more traditional facade would be in order to have greater continuity throughout the FDA campus.
Proposal (Full Report) - Depth of Structural Design
Breadth Proposal 1 - Constuction Management
Breadth Proposal 2 - Architectural