Welcome to Nate's AE Senior Thesis e-Portfolio

Final Report

The Final Report is the culmination of the research and analysis of the Hilton Hotel at BWI Airport over the past year for Nate's Senior Thesis project. It includes the new mechanical systems design, lighting analysis, acoustical analysis, and an overall costs analysis.

Please click here to view the entire pdf file (sorry, it's a large file - 21.4 MB).

Executive Summary

The new mechanical systems design for the Hilton Hotel at BWI Airport is described in the Final Report. It includes the background and design objectives for the project, as well as the research, procedure, and calculations done during the design process. Also covered are the breadth topics studied of Lighting and Acoustics. The Appendices contain all additional information used, and they are attached at the end of the report.

To view the Executive Summary for the Final Report, please click here.

For individual sections of the Final Report, please click on the links below.

Thesis Abstract


Acknowledements


Executive Summary


Project Background


Building Systems Overview


Existing Mechanical Systems


Design Considerations


Mechanical Systems Design


Energy and Emissions Analyses


Lighting Analysis


Acoustical Analysis


Overall Cost Analysis


Conclusions and Recommendations


References


Appendices

The Appendices include all the files used as reference for the Final Report.

Please click here to view the entire pdf file.

For individual sections of the Appendices, please click on the following links.

Appendix A - Chiller Selection


Appendix B - Cooling Tower Selection


Appendix C - Pump Selection


Appendix D - Heat Exchanger Selection


Appendix E - Air Handling Unit and Rooftop Unit Selection


Appendix F - Dedicated Outdoor Air System Unit Selection


Appendix G - Fan Coil Unit Selection


Appendix H - Typical Guest Room Lighting Renderings


Appendix J - Lighting Selection


Appendix K - Acoustical Analysis


Appendix L - Overall Cost Analysis


Appendix M - HAP Report Files

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | |
This Page was last updated on April 13, 2006 , By Nate Patrick and is hosted by the AE Department ©2005